Enniskillen Acute Hospital
Main Contractor
FCC Elliott
Subcontract Value
£4.10M
Subcontract Scope
Crean UK was awarded the flooring contract for Enniskillen Acute Hospital in October 2010.
The total floor area to the new acute Hospital is circa 65,000m2 along with circa 60,000 metres of coved skirting. Crean UK will be installing Armstrong Linoleum, Armstrong safety vinyl, Armstrong Wall Flex and range for ceramic tiles for communal and food preparation areas.The flooring package also includes 64 bespoke floor designs throughout the general circulation areas.
We are working closely with construction company, FCC Elliott, to deliver the “greenest hospital in the UK” with emphasis on sustainability and recycling.
Further to the above, there is an additional 10,000m2 of flooring to be installed into the KWA accommodation blocks with the final specification still to be confirmed.